How long does it take to build a scenario?
Build time depends less on the software than on what you are capturing and how much you are assessing. The first build takes the longest, and later ones reuse the same library.
How fast is a first build?
Most first-time creators publish their first working scenario within 20 minutes. The editor is no-code, and AI Assist can draft a scenario script, branching dialogue, assessment questions, marking criteria and hotspot placement to start from.
What have real projects taken?
Real projects have ranged from minutes to a few weeks.
- University of Worcester School of Nursing: first scenario published in five minutes
- BD: five Cube experiences built in a single day for IBMS Congress 2025
- Merthyr Tydfil College: a construction scenario taken from concept to live for students in under three weeks
How long does a done-for-you build take?
Node XR Studio delivers done-for-you scenarios, including on-site 360° filming, in 10 to 14 weeks from kickoff to launch. Discovery and scripting take two to three weeks, on-site filming one to three days, and post-production six to nine weeks.